Many performance issues only emerge after handover, when contractual leverage has reduced and remediation costs sit with the asset owner. Once the defects period closes, you lose the opportunity to hold contractors accountable for permanent, unresolved issues, and fixing poorly specified or installed networks post-handover is costly and often unfeasible.
Handover & Commissioning is built to catch and resolve exactly these issues before that window shuts. It tests and reconciles the network’s actual performance against your original specification while you still have contractual leverage to get problems fixed, rather than after the defects period has closed.
Handover & Commissioning checks the network performs as promised before you sign off. Here’s what’s covered:

Delivering schemes under planning obligations means needing confidence that what’s specified is what actually gets built.
Managing a heat network portfolio means needing someone acting solely on your behalf, not the contractor’s.
Inheriting long-term responsibility for a network’s performance means needing an independent check that it was delivered as promised.
Here’s what clients most often ask as they approach practical completion.
Once the defects period closes, the opportunity to hold contractors accountable for unresolved issues is lost. Handover & Commissioning is built to identify and resolve issues while that leverage still exists.
This is when speed matters most. A full review against the original specification can still be completed before the defects period closes, with issues resolved as a condition of final payment to the contractor — get in touch as soon as possible so there’s time to do that.
This is exactly the situation where Uniti supported Aster Group at Grace House: a full review of the heat network against the original specification, conducted before the defects period closed, with all identified issues resolved as a condition of final payment to the contractor.
It forms part of Handover & Commissioning, checking that operations and maintenance documentation is complete and accurate ahead of the network moving into operational use.
Handover & Commissioning connects directly into Operations & Maintenance, so performance can continue to be monitored once the network is live.
Get in touch before your defects period closes and let’s review where things stand.